According to Indonesian government regulation which written in Indonesian Directorate General of Oil and Gas (Ditjen Migas) decree No 84.K/38/DJM/1998, it is mandatory for Oil and Gas Company to have operating permission or held re-certification every three years for its static equipment including pipeline.
For existing pipeline, risk assessment is part of work to do to ensure that the pipeline still able to be operated safely or not.
PT. Trihasco Utama has appointed by several Oil and Gas Company to conduct risk assessment for pipeline certification. One of our experience is risk assessment for certification of 28” gas pipeline from Grissik to Sakernan (136.000 meters)
1. Independent analysis/review of design and operation document
2. Inspection report review
3. Perform/review mechanical calculation
4. Likelihood of Failure Assessment
5. Consequence of Failure Assessment
6.Determine pipeline risk score, conclusion and recommendation